Closing the Loop: Customer Feedback From Maintenance Tickets
Most teams using a CMMS or ticket system treat closure as the end of the job. In a well-run service operation it is the start of two things: telling the requester what happened, and learning from it. This is how to collect customer feedback on maintenance tickets without building a survey programme.
Step 1: Tell the requester what was done
When a ticket closes, the requester should receive a short message with the ticket number, what was found, what was done and how to reopen it. This single step reduces repeat calls and builds trust, because people stop wondering whether their request disappeared. It only works if the technician wrote a real resolution note, so make that note mandatory at closure.
Step 2: Ask one question
A long survey will not be answered. Send one question: was the issue resolved to your satisfaction? Offer yes or no, plus an optional comment, and keep a reopen option attached. A "no" should reopen or escalate the ticket automatically, not sit in a report.
Step 3: Read closed tickets as data
Once tickets carry consistent fields, closure data answers operational questions:
- MTTR (mean time to repair): the average time from report to resolution, by asset class and by priority.
- First-time fix rate: how often a ticket is resolved without a return visit.
- Repeat failures: the same asset or fault reappearing within a short window.
- Backlog trend: whether open tickets are growing or shrinking week on week.
- Reopen rate: a proxy for fixes that did not hold.
Each of these needs asset, category, timestamps and resolution note captured at the time. None can be reconstructed reliably afterwards.
Step 4: Feed planning
Repeat failures point to preventive maintenance tasks that are missing or too infrequent. Long repair times on one asset class point to spares or skills gaps. Review these monthly with the people who do the work, and adjust the preventive schedule based on what tickets show (see preventive vs reactive maintenance).
What to avoid
- Reporting only the count of tickets closed. Volume says nothing about whether problems stay solved.
- Averages without distribution. A few very long repairs can hide behind a healthy-looking mean.
- Collecting feedback and never acting on it.
Start small
Begin with two measures: average time to resolve by priority, and reopen rate. Both are simple to compute and both change behaviour quickly. For the fields that make this possible, read what every maintenance ticket must contain, and for keeping tickets moving, see notifications and escalation workflows.
Explore our CMMS and maintenance management solution.
For definitions and formulas, see maintenance KPIs explained.
Want this running in your operation?
Book a free operational assessment, or see our CMMS & Maintenance Management solution.